{"id":10663,"date":"2019-07-04T11:46:09","date_gmt":"2019-07-04T15:46:09","guid":{"rendered":"https:\/\/www.dunany.ca\/?p=10663"},"modified":"2019-10-18T10:59:00","modified_gmt":"2019-10-18T14:59:00","slug":"the-reconstruction-of-dunany-bridge-a-status-report","status":"publish","type":"post","link":"https:\/\/www.dunany.ca\/en\/the-reconstruction-of-dunany-bridge-a-status-report\/10663","title":{"rendered":"The Reconstruction of the Dunany Bridge."},"content":{"rendered":"<p>Last Wednesday, July 3, I visited the construction site of the Dunany Bridge.<\/p>\n<p>I was well received by the workers and the supervisor who gladly answered my questions. Here is my report.<a href=\"https:\/\/www.dunany.ca\/the-reconstruction-of-dunany-bridge-a-status-report\/10663\/20190703_133118\" rel=\"attachment wp-att-10666\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-10666\" src=\"https:\/\/www.dunany.ca\/wp-content\/uploads\/2019\/07\/20190703_133118.jpg\" alt=\"\" width=\"1018\" height=\"495\" srcset=\"https:\/\/www.dunany.ca\/wp-content\/uploads\/2019\/07\/20190703_133118.jpg 1018w, https:\/\/www.dunany.ca\/wp-content\/uploads\/2019\/07\/20190703_133118-300x146.jpg 300w, https:\/\/www.dunany.ca\/wp-content\/uploads\/2019\/07\/20190703_133118-768x373.jpg 768w\" sizes=\"auto, (max-width: 1018px) 100vw, 1018px\" \/><\/a><\/p>\n<p>This being a Heritage bridge &#8211; built in 1912 &#8211; restoring it is a time-consuming job as parts, here and there have to be replaced, one at a time. I have a long list of those that the MTQ provided me but it is all in engineering speak!<\/p>\n<p>As you can see from the pictures, the bridge deck has already been replaced. It was definitely at the end of its life. Maximum weight weight will now be limited to 22 tons.<a href=\"https:\/\/www.dunany.ca\/the-reconstruction-of-dunany-bridge-a-status-report\/10663\/20190703_133132-1\" rel=\"attachment wp-att-10670\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-10670 alignleft\" src=\"https:\/\/www.dunany.ca\/wp-content\/uploads\/2019\/07\/20190703_133132-1-146x300.jpg\" alt=\"\" width=\"146\" height=\"300\" srcset=\"https:\/\/www.dunany.ca\/wp-content\/uploads\/2019\/07\/20190703_133132-1-146x300.jpg 146w, https:\/\/www.dunany.ca\/wp-content\/uploads\/2019\/07\/20190703_133132-1.jpg 495w\" sizes=\"auto, (max-width: 146px) 100vw, 146px\" \/><\/a><\/p>\n<p>When I was there, the workers were busy installing scaffolding for the construction of a shelter that will encapsulate the bridge while it is being painted. Something like a large Tempo car shelter some people use in the winter.<a href=\"https:\/\/www.dunany.ca\/the-reconstruction-of-dunany-bridge-a-status-report\/10663\/20190703_133224-2\" rel=\"attachment wp-att-10668\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-10668 alignright\" src=\"https:\/\/www.dunany.ca\/wp-content\/uploads\/2019\/07\/20190703_133224-2-146x300.jpg\" alt=\"\" width=\"146\" height=\"300\" srcset=\"https:\/\/www.dunany.ca\/wp-content\/uploads\/2019\/07\/20190703_133224-2-146x300.jpg 146w, https:\/\/www.dunany.ca\/wp-content\/uploads\/2019\/07\/20190703_133224-2.jpg 495w\" sizes=\"auto, (max-width: 146px) 100vw, 146px\" \/><\/a><\/p>\n<p>And yes, <a href=\"http:\/\/www4.rncan.gc.ca\/search-place-names\/unique\/EKLUX\">le pont Noir, its official name<\/a>,\u00a0 will still be green!<\/p>\n<p>Later, in August, they will lift the whole bridge by about a foot to replace the foundation blocks.<\/p>\n<p>So far, work seems to be on schedule and the expected completion date is end of October.<\/p>\n<p>When this restoration is complete, the bridge should be as good as a new one, good for another 100 years!<\/p>\n<p>Total cost of the project is about 2M$ (planning, construction and supervision).<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Last Wednesday, July 3, I visited the construction site of the Dunany Bridge. I was well received by the workers and the supervisor who gladly answered my questions. Here is my report. This being a Heritage bridge &#8211; built in&hellip; <\/p>\n","protected":false},"author":2,"featured_media":10666,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[],"class_list":["post-10663","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-municipal-affairs"],"_links":{"self":[{"href":"https:\/\/www.dunany.ca\/en\/wp-json\/wp\/v2\/posts\/10663","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.dunany.ca\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.dunany.ca\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.dunany.ca\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.dunany.ca\/en\/wp-json\/wp\/v2\/comments?post=10663"}],"version-history":[{"count":10,"href":"https:\/\/www.dunany.ca\/en\/wp-json\/wp\/v2\/posts\/10663\/revisions"}],"predecessor-version":[{"id":11104,"href":"https:\/\/www.dunany.ca\/en\/wp-json\/wp\/v2\/posts\/10663\/revisions\/11104"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.dunany.ca\/en\/wp-json\/wp\/v2\/media\/10666"}],"wp:attachment":[{"href":"https:\/\/www.dunany.ca\/en\/wp-json\/wp\/v2\/media?parent=10663"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.dunany.ca\/en\/wp-json\/wp\/v2\/categories?post=10663"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.dunany.ca\/en\/wp-json\/wp\/v2\/tags?post=10663"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}